Timber and composite decks, patios, carports and stairs. Licensed, insured and QBCC 15580495, working across Brisbane, the Gold Coast and Beaudesert.
A deck is the highest return per dollar of anything we build. It is also the job people most often get quoted badly, because a deck looks simple from the top and almost everything that matters is underneath it.
The three things that decide whether a deck is still good in ten years are the footings, the drainage and the way it meets the house. None of them are visible in a photo. All of them are in our proposals.
This is the first thing to settle, because it changes the cost, the timeline and sometimes the design. Brisbane City Council exempts a deck from building approval only when it meets every one of these six conditions.
Read that list again and you can see why most real decks need approval. Ten square metres is about three metres by three. Anything you would put a table and six chairs on is already bigger than the exemption.
That is not a reason to shrink your deck. Building approval through a licensed certifier is a normal part of the job and we handle it. It is a reason to be suspicious of anyone who quotes you a deck without mentioning it, because the approval either got left out of the price or got left out entirely.
Two more things that sit outside the building approval question. Your property may need planning approval if it falls in an overlay such as the Traditional building character overlay or a neighbourhood plan area. And even an exempt deck still has to comply with the National Construction Code, so exempt does not mean unregulated.
You can check the overlays on your own address on City Plan online before you call anyone.
The one metre line decides balustrades, and balustrade openings cannot exceed 125 millimetres once you are above it. It often decides whether an engineer is involved too.
Soil type and slope set the footing size. Post bases should hold the timber clear of the ground rather than sit buried in concrete, which is how posts rot from the bottom.
A deck that sheds water back against your house, or that blocks subfloor ventilation, causes problems the deck itself will get blamed for. Fall and clearance get designed, not improvised.
The junction between new deck and existing wall is the leak point. Flashing it properly is cheap now and expensive later.
A roof changes the structure underneath, because the posts now carry a roof as well as people. Better to design for it now even if you add it later.
Where the sun lands in February, which door you will use, whether the barbecue needs a gas point and whether you want it wide enough for a table. Design decisions, not afterthoughts.
Not always, and this is the question we get asked most. Brisbane City Council lists six conditions, and a deck needs no building approval only if it meets every single one of them:
The plan area is no more than 10 square metres. It sits no more than one metre above the natural ground surface. It is not roofed. No side is longer than five metres. It does not affect the structural integrity of any existing building, retaining wall or other structure on your property or the one next door. And it does not alter an existing pool enclosure or pool fence.
Miss one of those and you need building approval. Put a roof over it and you need approval. Go over a metre high and you need approval. In practice most decks worth building need approval, and that is normal rather than a problem.
Separately, your property may need planning approval if it sits in an overlay such as the Traditional building character overlay. And even where no building approval is required, the work still has to comply with the National Construction Code.
One metre. Once the deck floor is more than a metre above the finished ground level, you need a balustrade at least a metre high.
The gap rule matters as much as the height. On a deck or balcony more than one metre above the ground, no opening in the balustrade can be greater than 125 millimetres. That is what rules out the widely spaced horizontal wire and slat designs people bring us from overseas websites.
Both are fine. They fail differently, which is the useful way to choose.
Hardwood looks better than composite on day one and worse than composite in year five unless you oil it. If you will not maintain it, do not buy it. Spotted gum and merbau both hold up well in this climate and both silver off if you let them.
Composite does not splinter, does not need oiling and holds its colour. It also gets hotter underfoot in full Queensland sun, costs more up front, and no composite looks quite like real timber up close.
Our actual advice: pick based on how much weekend maintenance you will genuinely do, not on the showroom sample.
It is a real consideration here and it is mostly solved in the detailing rather than the material. Keeping structural timber off the ground, using treated or naturally durable species where it matters, getting metal post bases under posts instead of burying them in concrete, and leaving the subfloor ventilated and inspectable.
A deck that traps moisture against your house and cannot be inspected underneath is a problem waiting to happen, regardless of what the boards are made of.
Yes. It is more work, because the posts get longer, the footings get bigger and anything over a metre brings in balustrades and often engineering, but a sloping block is usually where a deck adds the most, because it turns unusable ground into the best room in the house.
Steep sites may also need a structural engineer and, depending on height and location, consideration of wind loading. We work that out before we quote, not during the build.
Yes. Roofed outdoor structures, patio enclosures and carports, including the approval side. Worth knowing that adding a roof removes any chance of the building approval exemption, so a roofed structure is an approval job from the start.
Want a deck priced properly? Tell us roughly the size and where it would go. We will check the approval position for your address before we quote, so the number you get is the number it costs.
Request a proposal