Rear extensions, second storey additions and building in underneath. Licensed, insured and QBCC 15580495, working across Brisbane, the Gold Coast and Beaudesert.
An extension is usually the cheaper half of a comparison people make too late. By the time you add stamp duty, agent fees, moving costs and the premium on a bigger house in the suburb you already like, extending the place you own often wins. Not always. But often enough that it is worth pricing properly before you list.
We work on houses that already exist. That is a deliberate choice, not a limitation. An extension is a harder build than a new house, because nothing is square, the existing structure has to be understood before it can be touched, and you are living in the middle of it while the work happens. A volume builder is not set up for that, and most will quote it accordingly.
A new living area, a bigger kitchen, an extra bedroom and ensuite. The simplest structurally, because the new work lands on new footings and ties into the existing roof. Usually the best value per square metre.
A second storey when the block cannot give you any more ground. The existing house has to be able to carry it, so this one starts with an engineer looking at your footings and stumps rather than with a floor plan.
Very Queensland and very often overlooked. If your floor sits high enough, enclosing and finishing the space under the house gives you bedrooms, a rumpus or a flat without building a single new wall at ground level.
Plenty of jobs are a mix. A rear extension that also picks up a new deck, or an under house conversion that needs the floor above re levelled first. We work the scope out with you at the consultation, before anyone talks about a number.
We are not going to put a price per square metre on this page. Anyone who quotes you a rate before they have seen your house is guessing, and a guess that turns out low is the single most common way renovation budgets blow up. What we can do is tell you honestly which parts of your job move the number, so you know what we will be looking at when we walk the site.
Building approval is routine. Planning approval is not. An overlay or a neighbourhood plan can add months and a town planner to the job before construction starts, and it can change what you are allowed to build. This is the first thing we check.
Soil type decides your footings. Reactive clay, a sloping block, fill from a previous owner or a high water table all change what has to go in the ground, and footings are not a place to economise. On older houses we are also looking at whether the existing stumps and bearers can carry what you want to put on them.
Moving a kitchen or a bathroom means moving plumbing, and moving plumbing in a slab is a different job to moving it under a timber floor. Switchboard capacity matters too. A lot of older Brisbane houses cannot support what a modern extension asks of them without an upgrade.
Roof tie ins are where cheap extensions leak. Matching pitch, flashing the junction properly and getting the fall right costs more to do and far more to fix later.
An extension that opens up a load bearing wall needs an engineer and a beam. One that simply adds a room behind an existing opening does not. Two extensions of the same size can be very different jobs.
What you get from us instead of a rate. A paid consultation where we walk the site, work out which of the above apply to your house, and tell you what the project really involves. Then a written proposal with every inclusion listed, built on what we found rather than on an average. Go ahead with the job and the consultation fee comes off the price.
Almost always, yes. An extension adds floor area and changes the building envelope, so it needs building approval through a licensed building certifier, and often planning approval from Council as well.
Planning approval is the one that catches people. If your property sits in an overlay such as the Traditional building character overlay, or inside a neighbourhood plan area, what you are allowed to build is constrained before anyone draws anything. You can check which overlays apply to your address on City Plan online, and it is worth doing that before you fall in love with a design.
The build itself is usually the shorter half. Design, engineering, certification and council assessment commonly take longer than the construction, and they happen before a single tradesperson arrives.
The honest answer is that we cannot give you a date until we know whether your job needs planning approval, because that single factor moves the timeline more than the size of the extension does. Once approvals are in hand we give you a start date and a finish date, and if either moves you hear it from us first.
Building out is normally cheaper per square metre, because you are working at ground level and the new structure carries its own load straight into new footings.
Building up means the existing house has to carry the new floor. That usually brings in an engineer, new or upgraded footings and stumps, and temporary works while the roof comes off. It is the right answer when the block is small or the yard is worth keeping, but it is rarely the cheaper one.
On a lot of Queensland houses there is a third option people forget, which is building in underneath. If the existing floor is high enough off the ground, the cheapest new living space you will ever get is the space you already own.
Yes, and we do. Houses built before 1947 in designated areas fall under the Traditional building character overlay, which controls what can be altered, added or demolished.
In practice that usually means the street facing form of the original house has to be kept and the new work goes to the rear or underneath, sympathetic in scale and detail. It is more work to get approved, not impossible. What it does mean is that you should not buy a character house assuming you can take the front off it.
We can, and on most jobs that is the sensible way round. Most people come to us without plans, which is exactly what the consultation is for. We work out what the project actually needs, whether that is a draftsperson, an architect, a structural engineer, a building certifier or a town planner, and we coordinate them rather than handing you a list of phone calls to make.
Thinking about extending? Tell us roughly what you are picturing and which suburb you are in. We will tell you honestly whether it is worth doing and what it involves before you spend anything on drawings.
Request a proposal